Chambers Creek Regional Wastewater Treatment Plant

Pease provided mechanical and general construction services on this $10.5 million bid package to the GC/CM, Mortenson, on the multi-million dollar expansion to the existing Chambers Creek Wastewater Treatment Plant.

 

This project included cast in place concrete, masonry, structural steel, misc metal fabrications, grating, handrail, rough carpentry, facility fall protection, alum and fabric tank cover system, prefab alum odor covers, overhead bridge cranes, jib and davit cranes, fabricated stainless steel slide gates, installation of helicum scum skimmers, and non-metallic chain and flight sludge collection equipment. 

 

This project occurred at the existing Chambers Creek WWTP.  The plant was fully operational during construction.