Project | Intermodal Transit Facility – Phase 1, Phase 2 (TI), and Lot 8 (TI) |
---|
Pease & Sons, Inc. served as the General and Mechanical Contractor on three (3) separate projects for the City of University Place:
-
Intermodal Transit Facility - Phase 1: construction of a new three-story 92,000 SF concrete parking structure
-
Lot 8 Garage Phase 1: Construction of a new three-story 62,643 sqft concrete parking structure.
-
Intermodal Transit Facility Phase 2 - Tenant Improvements: Work within Lot 9 included new ventilation system and associated electrical work; fire sprinkler system installation; fire alarm system; masonry infill of west wall; exit sign installation; sidewalk and vehicle entry; interior railings; storage room walls, doors and structural infill floors; OH coiling grille @ vehicle entry; a fence to separate Lot 9 from Lot 8 and limit access to Level P1; and repair of existing concrete cracks.