Project | Klineline Pump Station |
---|
Construction of an 18.4 MGD peak flow capacity sewage pumping station which included:
-
Pump Station structure
-
Five (5) 250-hp raw sewage pumps
-
1,250 kW diesel standby generator
-
Activated carbon odor control system
-
Chemical injection system for odor and corrsion control
-
Connection to existing Klineline Pump Station force mains
-
Modifications to existing Salmon Creek interceptor
-
New watchperson's residence